{"id":17143,"date":"2025-07-15T13:15:53","date_gmt":"2025-07-15T13:15:53","guid":{"rendered":"https:\/\/www.activ-investment.eu\/kameralny-ruczaj-budowa-mocno-zaawansowana-50-mieszkan-juz-sprzedanych\/"},"modified":"2026-01-13T13:26:43","modified_gmt":"2026-01-13T13:26:43","slug":"kameralny-ruczaj-budowa-mocno-zaawansowana-50-mieszkan-juz-sprzedanych","status":"publish","type":"post","link":"https:\/\/www.activ-investment.eu\/en\/kameralny-ruczaj-budowa-mocno-zaawansowana-50-mieszkan-juz-sprzedanych\/","title":{"rendered":"Kameralny Ruczaj \u2013 construction well underway, 50% of apartments already sold!"},"content":{"rendered":"\n<p>Work is in full swing at the Kameralny Ruczaj construction site at ul. Ruczaj 40A in Krakow \u2013 both buildings are being erected simultaneously, and the top floor is currently under construction. The development will soon reach the open shell stage, which means that the construction of all floors has been completed.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">50% of apartments sold<\/h2>\n\n\n\n<p>Interest in the investment remains high \u2013 over half of the apartments have already been sold. Kameralny Ruczaj is an offer for people who value a quiet location in the green part of Ruczaj, with convenient access to public transport (a bus stop just a 2-minute walk away) and everyday infrastructure \u2013 a Biedronka supermarket around the corner, schools and kindergartens nearby.<\/p>\n\n\n\n<p>Functional, easy-to-arrange apartments ranging from 40 to 76 m\u00b2 are still available for sale, ideal for singles, couples and families with children. Each apartment offers a balcony or garden and the possibility of purchasing a parking space in the underground garage.<\/p>\n\n\n\n<p>\ud83d\udc49 Hurry up \u2013 some apartments are covered by a promotion: free storage room!<\/p>\n\n\n\n<p>\ud83d\udcde Tel. 12 397 12 25.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"500\" src=\"https:\/\/www.activ-investment.eu\/wp-content\/uploads\/WhatsApp-Image-2025-07-14-at-10.00.22-1024x500.jpeg\" alt=\"\" class=\"wp-image-16979\" srcset=\"https:\/\/www.activ-investment.eu\/wp-content\/uploads\/WhatsApp-Image-2025-07-14-at-10.00.22-1024x500.jpeg 1024w, https:\/\/www.activ-investment.eu\/wp-content\/uploads\/WhatsApp-Image-2025-07-14-at-10.00.22-300x146.jpeg 300w, https:\/\/www.activ-investment.eu\/wp-content\/uploads\/WhatsApp-Image-2025-07-14-at-10.00.22-768x375.jpeg 768w, https:\/\/www.activ-investment.eu\/wp-content\/uploads\/WhatsApp-Image-2025-07-14-at-10.00.22-1536x750.jpeg 1536w, https:\/\/www.activ-investment.eu\/wp-content\/uploads\/WhatsApp-Image-2025-07-14-at-10.00.22.jpeg 2040w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Work is in full swing at the Kameralny Ruczaj construction site at ul. Ruczaj 40A in Krakow \u2013 both buildings...<\/p>\n","protected":false},"author":3,"featured_media":16980,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[108,20,70],"tags":[],"class_list":["post-17143","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-active-investment","category-all-categories","category-krakow-en"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.activ-investment.eu\/en\/wp-json\/wp\/v2\/posts\/17143","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.activ-investment.eu\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.activ-investment.eu\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.activ-investment.eu\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.activ-investment.eu\/en\/wp-json\/wp\/v2\/comments?post=17143"}],"version-history":[{"count":2,"href":"https:\/\/www.activ-investment.eu\/en\/wp-json\/wp\/v2\/posts\/17143\/revisions"}],"predecessor-version":[{"id":17146,"href":"https:\/\/www.activ-investment.eu\/en\/wp-json\/wp\/v2\/posts\/17143\/revisions\/17146"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.activ-investment.eu\/en\/wp-json\/wp\/v2\/media\/16980"}],"wp:attachment":[{"href":"https:\/\/www.activ-investment.eu\/en\/wp-json\/wp\/v2\/media?parent=17143"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.activ-investment.eu\/en\/wp-json\/wp\/v2\/categories?post=17143"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.activ-investment.eu\/en\/wp-json\/wp\/v2\/tags?post=17143"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}