{"id":21654,"date":"2026-03-11T09:19:05","date_gmt":"2026-03-11T09:19:05","guid":{"rendered":"https:\/\/www.activ-investment.eu\/swiatovida-w-warszawie-odslaniamy-elewacje\/"},"modified":"2026-03-18T15:28:38","modified_gmt":"2026-03-18T15:28:38","slug":"swiatovida-w-warszawie-odslaniamy-elewacje","status":"publish","type":"post","link":"https:\/\/www.activ-investment.eu\/en\/swiatovida-w-warszawie-odslaniamy-elewacje\/","title":{"rendered":"We are unveiling the fa\u00e7ade of Building B1 at \u015awiatoVida in Warsaw. The investment is entering its final stage of construction"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\"><strong>We are unveiling the fa\u00e7ade of Building B1 at \u015awiatoVida in Warsaw. The investment is entering its final stage of construction<\/strong><\/h2>\n\n\n\n<p>The construction of the \u015awiatoVida development in Warsaw has reached another important milestone. We have begun the gradual unveiling of the fa\u00e7ade of Building B1, allowing the project to take on its final form. With each passing week, the development more clearly reveals its target character and integrates more strongly into the landscape of this part of Tarchomin.<\/p>\n\n\n\n<p>Construction works are progressing according to schedule. Completion of Building B1 is planned for Q2 2026, while Building B2 is scheduled to be completed in early 2027.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"608\" src=\"https:\/\/www.activ-investment.eu\/wp-content\/uploads\/Projekt-bez-nazwy-30-1024x608.jpg\" alt=\"\" class=\"wp-image-21553\" srcset=\"https:\/\/www.activ-investment.eu\/wp-content\/uploads\/Projekt-bez-nazwy-30-1024x608.jpg 1024w, https:\/\/www.activ-investment.eu\/wp-content\/uploads\/Projekt-bez-nazwy-30-300x178.jpg 300w, https:\/\/www.activ-investment.eu\/wp-content\/uploads\/Projekt-bez-nazwy-30-768x456.jpg 768w, https:\/\/www.activ-investment.eu\/wp-content\/uploads\/Projekt-bez-nazwy-30-1536x911.jpg 1536w, https:\/\/www.activ-investment.eu\/wp-content\/uploads\/Projekt-bez-nazwy-30.jpg 1820w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Only 5 apartments remain at \u015awiatoVida<\/strong><\/h2>\n\n\n\n<p>The dynamic pace of construction is matched by the final stage of sales. Only 5 units are still available in the \u015awiatoVida development:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>2 studio apartments \u2013 29 m\u00b2<\/li>\n\n\n\n<li>3 investment units: 1 compact one-room apartment of 31 m\u00b2 and 2 functional two-room apartments of 34 m\u00b2 and 35 m\u00b2<\/li>\n<\/ul>\n\n\n\n<p>This is the last opportunity to become part of Activ Investment\u2019s first development in Warsaw. Since its launch, the project has attracted strong interest from those seeking both comfortable living spaces and a secure form of capital investment<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Tarchomin: Comfort of living and reliable returns<\/strong><\/h2>\n\n\n\n<p>The location of \u015awiatoVida \u2013 right next to Galeria P\u00f3\u0142nocna \u2013 is one of its strongest advantages. Immediate proximity to shops, restaurants, and services makes it an exceptionally convenient place for everyday living.<\/p>\n\n\n\n<p>From an investment perspective, the proximity to public transport and well-developed local infrastructure make these apartments an excellent capital investment. The success of this project is confirmed by the fact that nearly all units were sold during the construction phase.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Final units available at \u015awiatoVida<\/strong><\/h2>\n\n\n\n<p>If you are considering purchasing an apartment in Warsaw \u2013 either for personal use or as a rental investment \u2013 now is the time to act. With such limited availability, the remaining units are quickly disappearing from the market.<\/p>\n\n\n\n<p>Contact us to check the last available apartments at \u015awiatoVida.<\/p>\n\n\n\n<p>\ud83d\udcde +48 22 597 23 72<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/www.activ-investment.eu\/en\/apartments\/swiatovida\/\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"764\" data-id=\"13657\" src=\"https:\/\/www.activ-investment.eu\/wp-content\/uploads\/Wiz-1-7-1024x764.jpg\" alt=\"Nowe osiedle w Warszawie. \u015awiatoVisa\" class=\"wp-image-13657\" srcset=\"https:\/\/www.activ-investment.eu\/wp-content\/uploads\/Wiz-1-7-1024x764.jpg 1024w, https:\/\/www.activ-investment.eu\/wp-content\/uploads\/Wiz-1-7-300x224.jpg 300w, https:\/\/www.activ-investment.eu\/wp-content\/uploads\/Wiz-1-7-768x573.jpg 768w, https:\/\/www.activ-investment.eu\/wp-content\/uploads\/Wiz-1-7-1536x1146.jpg 1536w, https:\/\/www.activ-investment.eu\/wp-content\/uploads\/Wiz-1-7.jpg 1787w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Inwestycja \u015awiatoVida<\/figcaption><\/figure>\n<\/figure>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>We are unveiling the fa\u00e7ade of Building B1 at \u015awiatoVida in Warsaw. The investment is entering its final stage of...<\/p>\n","protected":false},"author":3,"featured_media":21554,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[20],"tags":[],"class_list":["post-21654","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-categories"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.activ-investment.eu\/en\/wp-json\/wp\/v2\/posts\/21654","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.activ-investment.eu\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.activ-investment.eu\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.activ-investment.eu\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.activ-investment.eu\/en\/wp-json\/wp\/v2\/comments?post=21654"}],"version-history":[{"count":1,"href":"https:\/\/www.activ-investment.eu\/en\/wp-json\/wp\/v2\/posts\/21654\/revisions"}],"predecessor-version":[{"id":21658,"href":"https:\/\/www.activ-investment.eu\/en\/wp-json\/wp\/v2\/posts\/21654\/revisions\/21658"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.activ-investment.eu\/en\/wp-json\/wp\/v2\/media\/21554"}],"wp:attachment":[{"href":"https:\/\/www.activ-investment.eu\/en\/wp-json\/wp\/v2\/media?parent=21654"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.activ-investment.eu\/en\/wp-json\/wp\/v2\/categories?post=21654"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.activ-investment.eu\/en\/wp-json\/wp\/v2\/tags?post=21654"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}