{"id":22337,"date":"2026-07-10T08:59:44","date_gmt":"2026-07-10T08:59:44","guid":{"rendered":"https:\/\/www.activ-investment.eu\/100-mieszkan-w-inwestycji-swiatovida-sprzedanych\/"},"modified":"2026-07-10T12:06:46","modified_gmt":"2026-07-10T12:06:46","slug":"100-mieszkan-w-inwestycji-swiatovida-sprzedanych","status":"publish","type":"post","link":"https:\/\/www.activ-investment.eu\/en\/100-mieszkan-w-inwestycji-swiatovida-sprzedanych\/","title":{"rendered":"A Major Milestone in Warsaw: \u015awiatoVida Reaches 100% Sales"},"content":{"rendered":"\n<h1 class=\"wp-block-heading\">A Major Milestone in Warsaw: \u015awiatoVida Reaches 100% Sales<\/h1>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>All apartments at the \u015awiatoVida development, located on Pa\u0142uk\u00f3w Street in Warsaw\u2019s Bia\u0142o\u0142\u0119ka district, have now been sold. Sales were completed before the entire project was finished, making this achievement particularly significant for us. \u015awiatoVida marks Activ Investment\u2019s debut on the Warsaw residential property market.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The strong sales performance has been accompanied by rapid construction progress. Building B1 is now virtually complete, while Building B2 will be delivered ahead of the original schedule. Although completion was initially planned for March 2027, construction work is now expected to conclude in 2026.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">All Apartments Have Found Their Owners<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">\u015awiatoVida is being developed on Pa\u0142uk\u00f3w Street, directly adjacent to Galeria P\u00f3\u0142nocna shopping centre. From the outset, the project attracted considerable interest from both owner-occupiers and clients purchasing apartments as rental investments.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The success of the development was driven by a combination of functional apartment layouts, contemporary architecture and a location offering convenient access to shops, services, public transport and essential everyday amenities.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/www.activ-investment.eu\/wp-content\/uploads\/SwiatoVida-Warszawa-1-1024x576.jpg\" alt=\"Mieszkania w Warszawie\" class=\"wp-image-22323\" srcset=\"https:\/\/www.activ-investment.eu\/wp-content\/uploads\/SwiatoVida-Warszawa-1-1024x576.jpg 1024w, https:\/\/www.activ-investment.eu\/wp-content\/uploads\/SwiatoVida-Warszawa-1-300x169.jpg 300w, https:\/\/www.activ-investment.eu\/wp-content\/uploads\/SwiatoVida-Warszawa-1-768x432.jpg 768w, https:\/\/www.activ-investment.eu\/wp-content\/uploads\/SwiatoVida-Warszawa-1-1536x864.jpg 1536w, https:\/\/www.activ-investment.eu\/wp-content\/uploads\/SwiatoVida-Warszawa-1-2048x1152.jpg 2048w, https:\/\/www.activ-investment.eu\/wp-content\/uploads\/SwiatoVida-Warszawa-1.jpg 2240w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"><em>\u015awiatoVida- Nowe Mieszkania w Warszawie<\/em><\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Completing apartment sales before the end of construction confirms that the project successfully responded to the needs and expectations of Warsaw\u2019s residential property market.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Building B1 Nears Completion<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Construction work on Building B1 is now almost complete. The installations, fa\u00e7ade, roof, plasterwork, flooring and windows have all been completed. Finishing work in the common areas, as well as the landscaping of the courtyard and the area surrounding the building, is now entering its final stage.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The building has already achieved its final architectural appearance. Current work is focused primarily on final finishing, cleaning, inspections and handover preparations.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Building B2 to Be Completed Ahead of Schedule<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Work on Building B2 is also progressing efficiently. The building structure and masonry walls have been completed, and all windows have been installed. The installations, plasterwork, flooring and fa\u00e7ade are now at an advanced stage.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Construction teams have already begun interior finishing work. At the same time, landscaping work is being carried out in the courtyard and throughout the surrounding development area.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The original schedule anticipated completion of the building in March 2027. Thanks to efficient project management and the strong pace of construction, we now expect the work to be completed in 2026.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"747\" src=\"https:\/\/www.activ-investment.eu\/wp-content\/uploads\/11-16-1024x747.jpg\" alt=\"Warszawa Activ Investment\" class=\"wp-image-22035\" srcset=\"https:\/\/www.activ-investment.eu\/wp-content\/uploads\/11-16-1024x747.jpg 1024w, https:\/\/www.activ-investment.eu\/wp-content\/uploads\/11-16-300x219.jpg 300w, https:\/\/www.activ-investment.eu\/wp-content\/uploads\/11-16-768x560.jpg 768w, https:\/\/www.activ-investment.eu\/wp-content\/uploads\/11-16.jpg 1480w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"><em>Inwestycja \u015awiatoVida<\/em><\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">An Important Milestone for Activ Investment in Warsaw<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">\u015awiatoVida is Activ Investment\u2019s first residential development in Warsaw. Selling all apartments before construction is completed confirms that clients recognised both the quality of the project and the potential of its location.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This achievement is the result of the work of the entire team involved in the development process, including project preparation, construction, sales, marketing and customer service.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">We would like to thank everyone who placed their trust in us and chose \u015awiatoVida as their future home or property investment. We would also like to thank our partners and contractors for their commitment and consistent delivery of the project.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Activ Investment Remains Committed to Bia\u0142o\u0142\u0119ka<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The completion of sales at \u015awiatoVida does not mark the end of our presence in this part of Warsaw. We are already working on further residential projects in the Bia\u0142o\u0142\u0119ka district.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Detailed information about our upcoming developments will be published on the Activ Investment website and across our social media channels.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u015awiatoVida concludes an important chapter in our sales activity while opening the next stage of Activ Investment\u2019s growth in Warsaw. See you soon.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A Major Milestone in Warsaw: \u015awiatoVida Reaches 100% Sales All apartments at the \u015awiatoVida development, located on Pa\u0142uk\u00f3w Street in...<\/p>\n","protected":false},"author":3,"featured_media":22324,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[20],"tags":[],"class_list":["post-22337","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-categories"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.activ-investment.eu\/en\/wp-json\/wp\/v2\/posts\/22337","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.activ-investment.eu\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.activ-investment.eu\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.activ-investment.eu\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.activ-investment.eu\/en\/wp-json\/wp\/v2\/comments?post=22337"}],"version-history":[{"count":2,"href":"https:\/\/www.activ-investment.eu\/en\/wp-json\/wp\/v2\/posts\/22337\/revisions"}],"predecessor-version":[{"id":22341,"href":"https:\/\/www.activ-investment.eu\/en\/wp-json\/wp\/v2\/posts\/22337\/revisions\/22341"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.activ-investment.eu\/en\/wp-json\/wp\/v2\/media\/22324"}],"wp:attachment":[{"href":"https:\/\/www.activ-investment.eu\/en\/wp-json\/wp\/v2\/media?parent=22337"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.activ-investment.eu\/en\/wp-json\/wp\/v2\/categories?post=22337"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.activ-investment.eu\/en\/wp-json\/wp\/v2\/tags?post=22337"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}